Opportunities
Background
on the ProjectThe Waste Plastic to Oil/Power Project is at
present considered in modular size of 5 TPD/33 TPD with multiple
modules of the main plant as per requirement in specific case based
on power demand and raw material availability at economic terms. A
typical 5 TPD plant will give min. 1.25 MW & 33 TPD plant will
give 8 MW power. The plant capacity (5 TPD/33 TPD) refers to the
input feed of mixed waste plastics to be fed per day in two shifts.
Local statutory approvals for setting up such plants will have to be
obtained as required. The Project involves following major blocks:-
- Overall Plant
The overall plant area is min. 2
acres for 5 TPD & 5 acres for 33 TPD without considering
dispatch of bottling gas/bulk unloading facilities in conformity
with relevant rules for process and storage of such products.
However, considering future provision for 100 TPD (i.e. 3x33
TPD) additional are may be taken. The location of the Plot, wrt
evacuation of power/products and raw material availability and
development of the site for quick implementation of the project
within 3 to 4 months is crucial.
- Civil Constructions & related Electricals
These
involve, boundary wall, site leveling/grading etc, security
gate, administrative blocks, laboratory, raw material storage,
foundation & structures for main plant, underground storage
of LPG/Liquid Products, Gas/DG Sets, Sub-Station & Yard
works, utilities, implant roads, fencing, green belts etc. with
all related, electricals, for Lighting (in all plant yard
lighting) protection & controls.
- Main Plant & Finished Products Storage involve equipments
like gravimetric hoppers, weigh batch feeders, screw &
pneumatic conveyors, melters/reactor vessels, heaters (up to 450
Degree C electrical/otherwise), dewaxers, condensors/heat
exchangers, gas/oil separators, scrubbers (cl/SO2 etc), cooling
system, gas holders, compressors, mounted storage of
gasses/liquids with all related PLC Controls/electricals, alarm,
piping, valves, flow meters etc, decoking & removal of cokes
with/without brightening as per market demand.
- Finished Product Utilization
The finished
products (waste plastic gas/oil) is to be used to generate
power, preferably using simultaneous dual fired sets
(gas/liquid), in which case no facility for bulk unloading may
be put up. (However, depending upon space availability /market
economics, bulk unloading facility may also be put up). The
power generating sets are also planned to be modular sizes. (500
KVA to 2 MW depending on availability/cost economics) with
synchronization to feed to dedicated user and /or supply grid of
11 KV/33KV etc. as required.
The projects are expected
to be set up near all major metros, urban cities etc. in India
and abroad. These will be executed using in-house core group to
handle all aspects, with engaging retainers/consultants in
specific areas. Accordingly following key resources are
identified for the core team.
|
 |